How to Fix Sinking Concrete

Sinking concrete can sometimes be repaired by restoring support and lifting the existing slab. First, establish which section has moved and whether the concrete remains fit to retain. A higher neighbouring panel may have heaved, while rocking under wheels can indicate incomplete support below. The Lifting Specialists assess those differences before recommending treatment. The repair plan considers the cause, achievable levels and the way the surface will be used once the work is complete.

Treat the Loss of Support as Its Own Problem

The upper concrete surface can conceal an unsupported edge. Water and repetitive loading can dislodge fines and create a gap. A slab that flexes under traffic can damage a previously sound joint. If a settled area was built across a filled trench, the affected line may continue beyond the visible step. Investigating the edge or buried services can reveal whether restoring contact demands more than lifting a single corner.

Decide What Level Can Be Recovered

Work to agreed reference points and consider the interfaces that will remain fixed. Lifting a pad beside a door may reduce a trip while bringing paving too close to a threshold. Some slabs carry services or columns and require a wider assessment before treatment. For an otherwise sound panel, targeted jacking can retain an existing surface. Where concrete integrity or redesign is the main issue, assess replacement.

What Rocking Tells You About the Panel

Rocking suggests the slab can pivot or deflect where support is incomplete. Listen for a dull impact and observe from a safe place under normal use. Fines expelled near a joint after rain can suggest water movement below the slab. The result should be assessed both at rest and against the loads appropriate to the repaired surface.

Distinguish Loss of Contact From Low Ground Strength

The appearance of a low slab does not reveal whether an empty gap or compressible material lies underneath. A cavity interrupts bearing, while weak soil can remain in contact with the panel and still deform under load. The investigation needs to distinguish those conditions before injection is specified. An old trench can contain both loose backfill and local voids. The treatment depth and extent should follow that evidence, with completion checks appropriate to the traffic or structure being supported.

Evaluate Joints and Edge Restraint

Concrete joints can either permit movement or connect adjoining panels. Before lifting, establish how the affected slab relates to steps, drains and neighbouring concrete. Steel ties or a thickened edge can restrict the available movement. Edge damage caused by repeated wheel impact may also require a separate repair. A good scope identifies both the intended level change and any joint work needed afterwards, allowing the owner to plan the full reinstatement rather than judge the repair by height alone.

When the Higher Panel May Be the Problem

Compare the height of both panels with known levels beyond the joint. If a nearby root or an increase in soil moisture has lifted one edge, raising the other may leave both in an awkward position. A level survey can help identify the direction of movement. Changes in seasons and nearby planting provide useful context.

Set a Stable Reference for Level Readings

Levels should be recorded against a reference outside the suspected movement zone. Measuring several points on each panel helps distinguish a general drop from rotation or local deflection. A nearby wall, drain or slab should be checked before being treated as a fixed benchmark. These readings establish the geometry of the problem. Older surveys and photographs can then help determine whether the position is changing and which interfaces govern a practical lift target.

How a Controlled Concrete Lift Progresses

Controlled lifting proceeds in stages, with the concrete's response guiding the next injection. The first material may fill available space without producing visible movement. As the slab rises, the team checks its relationship to adjoining surfaces and fixed details. A connected panel may rotate or resist further movement, requiring a pause or revised target. The completed readings should show the position achieved and explain any low section left because further lifting would risk damage or compromise drainage.

Follow the Water Through the Site

Water can contribute to settlement by softening support, transporting fine material or entering an old service trench. Look beyond the low panel to downpipes, garden runoff and the condition of nearby drains. A dry surface during inspection may conceal a problem that appears only after sustained rain. Record those events where safe and obtain plumbing findings if a buried fault is suspected. The concrete repair should be coordinated with any work needed to manage the source.

Concrete Repair Methods Explained

Our slab jacking service explains how suitable low panels are raised. Resin injection covers filling defined gaps and selected ground treatment. If the defect involves a building's foundations, see underpinning. For a concrete crack carrying water, explore injection waterproofing. The articles on why concrete slabs sink and concrete lifting versus replacement provide further guidance on choosing the next step.

Discuss Your Sinking Concrete

Call 0414 799 325 if a concrete panel has dropped or begun to move under normal traffic. Describe the surface, its use and any recent change in drainage. For background, read why concrete slabs sink and our comparison of concrete lifting versus replacement.

Quick enquiry

Request a site inspection

Tell us what has changed at your property – a few photos help.

    Add photos · drag & drop or browse (optional)

    We only use your details to respond to your enquiry.

    0414 799 325

    Prefer to talk? Call us

    Has your concrete or footing moved?

    Tell us what has changed at your property and we can discuss the next step, including any investigation needed before treatment begins.